空壓機的(de)停用在各(ge)個單位都(dou)常有發生(sheng)。那麼在初(chu)次開機前(qian)空壓機停(ting)放時間超(chao)過三個月(yue)或空壓機(ji)停用時間(jian)超過三個(ge)月,再🧎🏻♀️➡️次開(kai)機前需要(yao)采取有效(xiao)措施,bi須先(xian)請專業空(kong)壓👼🏾機人員(yuan)對機器進(jin)行保養檢(jian)測,制定安(an)全措施,避(bi)免開機後(hou)發生不良(liang)狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢(jian)查電路狀(zhuang)态,是否正(zheng)常供電,電(dian)壓是否穩(wen)定;測量👨🏻🏭電(dian)動⛹🏻♂️機😍絕緣(yuan)電阻,數值(zhi)大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查(cha)空壓機配(pei)件上是否(fou)含有積水(shui),灰塵,及時(shi)清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進(jin)氣口,出氣(qi)口全面檢(jian)測,防止發(fa)生堵塞現(xian)象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述(shu)都已經完(wan)成的情況(kuang)可以接通(tong)電源,查看(kan)電腦控👽制(zhi)器是否正(zheng)常運行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更(geng)換三濾和(he)潤滑油。因(yin)為在長期(qi)不用的情(qing)況下,三濾(lü)👻,油可能發(fa)生老化現(xian)象,從而造(zao)成空壓機(ji)開機運行(hang)時間不長(zhang)即結膠積(ji)碳🧛🏾♀️或堵塞(sai),油路不暢(chang)使空壓機(ji)主機或其(qi)他🙂↕️零部件(jian)損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業(ye)人員試機(ji),電路改造(zao)後人工控(kong)制加載卸(xie)載,先空✍🏻載(zai)運行10分鐘(zhong)以上,檢測(ce)各項指标(biao)和震動、噪(zao)音等正常(chang),再進行加(jia)載,查看各(ge)部件運行(hang)正常即可(ke)。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.